Current News

Pre-feasibility study to determine the viability of a solar power plant in Laos

Sunlabob in May 2018, signed a contract with a hydro power company to conduct a pre-feasibility study to assess the selected sites using the existing infrastructure and the economic viability to develop a potential solar power plant. The assessment will provide the hydro power company with recommendation and necessary information to base the future staged studies and project development.